// OZEV-AUTHORISED · 612 INSTALLS
EV charging,
installed in one day.
Voltline installs every major UK chargepoint brand — Zappi, Wallbox, Pod Point, Ohme, EO. 7 kW for the driveway from £899, 22 kW for workplace and small-business car parks. OZEV grant paperwork done for you.
// Wallbox Pulsar Plus
7 kW · Type 2
// Amps
32 A
// Range/hr
25 mi
// Install
1 day
// Live job · Henleaze BS9
7 kW driveway · same-day energisation · from £899
// Compatibility checker
Tell us your car. We’ll narrow the chargers.
Different EVs accept different AC charging speeds. Picking a 22 kW charger for a 7 kW car is wasted spend — this filter makes sure you only see chargers worth quoting.
// Step 01
Select your vehicle
// Vehicle spec
- Battery
- 75 kWh
- Inlet
- Type 2 + CCS
- Max AC
- 11 kW
// Compatibility
4 matches
Filtered against your vehicle’s onboard charger.
// Recommended chargers
- 7.4 kW
myenergi
Zappi v2.1 (7 kW)
Eco mode diverts surplus solar PV. Best in class for solar households.
App controlSolar diverterTethered optionfrom £1,195 fittedQuote this → - 7.4 kW
Wallbox
Pulsar Plus
Compact, sleek, app-controlled. Excellent for tight garage installs.
App controlfrom £945 fittedQuote this → - 7.4 kW
Pod Point
Solo 3S
Reliable workhorse. Strong UK aftercare network.
App controlTethered optionfrom £999 fittedQuote this → - 7.4 kW
Ohme
ePod
Octopus Intelligent compatible — slashes off-peak charging cost.
App controlfrom £899 fittedQuote this →
// OZEV grants
Grants worth claiming. We handle the paperwork.
OZEV EVCG
EV Chargepoint Grant — flats & renters
Up to £350 off the cost of a domestic chargepoint for flat owners and renters. We submit the paperwork on your behalf.
OZEV WCS
Workplace Charging Scheme
75% off chargepoint cost (capped at £350/socket, up to 40 sockets) for businesses, charities and the public sector.
OZEV IRG
Infrastructure Grant — landlords
Up to £30,000 toward the wider electrical infrastructure on residential car parks. Fully managed by Voltline.
// Install process
Survey to plug-in, typically 7 working days.
// 01
30-min remote survey
Photos of fuse board, supply cable and proposed charger location. Often enough to quote.
// 02
Site visit (if needed)
Free onsite check for any property where remote photos can’t confirm load.
// 03
DNO Form A
We submit the network operator notification — required for any chargepoint > 3.68 kW.
// 04
Install day
Typical 4–6 hours. Charger commissioned, tested, registered with the manufacturer’s app.
// 05
Smart-meter setup
Linked to your Octopus / Ohme / OVO tariff so you charge at off-peak rates.